Tag Archives: landscaping

Reuse, Recycle

Warning – I think this might be a long post but I don’t want to try to break it up into two or three smaller posts.  Persevere through the rambling history – it will be worth it, I promise…

 

Often my husband complains people comment that I am always building/making something but really I am always moving/changing something.  Inside and outside my childcare home I create the furnishings, equipment, lofts, storage units etc to fit a specific space or purpose to suit the interests/needs of the group of children enrolled at that time. Sometimes there are items in stores or catalogues that I like but the dimensions or features are wrong for my application so I draw a plan and make one that will work.

Sometimes I feel my projects may seem incomplete/unfinished – maybe I didn’t have enough time to complete my vision due to inclement weather or other delays.  Possibly the project has several phases or there was something I forgot to take in to consideration when I made the plan.  I’ve taken down shelf units and discovered that the wall behind them was a color that is no longer on any other wall in the house and I have had neither the time nor any extra paint to fix it.  That’s OK because for me everything is really just temporary – it may not be long before I devise another plan that will require another change and that wall will be covered again.  The original project may even be abandoned entirely in favor of a better idea.

When I remove something from the play space I rarely discard any of the pieces – there may be another use for them at another time.  Sometimes I’ve even secretly dug a piece or two of scraps from the cut off bin that I felt were too valuable to have been put there.  It drives me crazy to watch those home renovation shows when they take a sledge hammer to the place and destroy perfectly usable parts. Go ahead, label me a ‘hoarder’ but I can’t count the number of times I’ve said something like “You know what I need here… wait…  I’ve got something in the basement/shed/bin that just might work”.  Occasionally I even ‘attach’ items that are not really needed at the time but it is easier than finding a place to store the extra pieces.  It is better for the environment if I can reuse something.  Besides, I find shopping for new stuff is so time consuming, often stressful and definitely more expensive.

This spring/summer I have changed at least a portion of every part of our indoor and outdoor play spaces.  In fact, I just looked at the slideshow on my homepage and realized that NONE of the spaces pictured there exist anymore!  Yet, for all my recent projects and changes I estimate the total cost of supplies to be less than $300 – that is a small price tag for a fairly major renovation.  Of course, that doesn’t cover what labour costs might be if I didn’t consider renovating to be an exciting recreational activity – I’d rather be in the midst of a construction project than traveling or laying on a beach any day!  That comment now leads perfectly to the real topic of this post;

‘What I Did on My Vacation – 2016 Edition’.

This year the bulk of the work was done to the outdoor play space – hooray, plenty of outdoor time!  There were several preliminary projects that were done earlier in the spring.  The biggest of those involved moving the garden – this couldn’t wait until vacation time because our seedlings needed to be planted earlier than mid-July so the garden phase was started in May.  For a while the old and new garden spaces were only partially finished and had to wait for other project phases to be done.  The most noticeable change took place during the first week of July – the removal of what was left of the shed.

Here is a little shed history.  The original 8 x 10 backyard shed was built a long time ago – I’m not even certain of the exact year but I’m going to estimate that it was about 1999.  My husband designed it and the entire space belonged to him – the children and I used only the 12’x30′ ground level deck, the gravel area and a small storage shed beside the upper deck.  In 2009 when I wanted to plant a garden we disassembled the entire shed and then reassembled it on top of the deck adjacent to my little shed.  This enabled me to use the ground space where my husband’s shed had been in exchange for a portion of the deck that we rarely used.

That worked for several years until 2013 when we moved half the big shed to the side yard.  The side yard shed contained the tools and allowed my husband to work in his separate side yard space at the same time as the children and I were playing in the back yard. There wasn’t room for the whole shed in the side yard so we left half of it on the back deck.  Last summer we put windows in remaining section of the backyard shed thinking maybe it would make a good playhouse type space.  However, it was only used maybe three or four times in the past year and I felt the open deck space would be more beneficial so down it came.  Of course I’ve safely stored the windows and all the other usable parts too.

Throughout all these shed projects the only time we purchased new wood was when we didn’t have old pieces that were long enough.  Consequently there was a lot of nostalgia as the shed was disassembled.  I found grey boards from the original shed, green and purple boards from the old wooden play structure, white boards from the old fence, black pieces from the old wooden wagon and even a couple dark brown stained pieces that may have even been from the shed at our old house!

So, I bet you are wondering what the ‘new’ back yard looks like.  You’re probably getting tired of just words so how about a bunch of pictures with just a few words.  Here is the view of the gravel area from the ‘new’ entrance;

16-07-RR03

And a closer view of the tipi corner;

16-07-RR03a

This is where the entrance to the gravel area used to be – I always had to trim the willow back so we could get by.  Now I can let it grow and it makes such a cozy seating area (you can hardly see the benches in the corner).  The cinder block ‘chalk wall’ was extended too;

16-07-RR04

Here’s another view of that corner;

16-07-RR04a.JPG

This is the new little ‘bridge’ entrance to the gravel area;

16-07-RR04b

The entrance to the gravel area was moved to make way for the new garden space so all these projects were done in May.  This is what our new garden looked like in June – peas, beans, corn, peppers, tomatoes, wheat and flax;

16-07-RR05

And in July;

16-07-RR05a

From the other side;

16-07-RR05b

Here’s the new seating/play area where the old garden had been.  The children call this the ‘trampoline’ because the thick layer of mulch is spongy to walk/run on.  Part of the old garden is still here – Milkweed and herbs.

16-07-RR06

Here is what you see if you sit on the benches and look toward the gravel area;

16-07-RR06a

This is Frank – a friend I made when we first began the shed demo.  I kept moving him to safer places so he didn’t accidentally get squished.

16-07-RR01.JPG

So beautiful and friendly.  Kept distracting me.  Almost forgot to take the ‘before demo’ picture.  Here’s an ‘already started but still mostly there’ picture;

16-07-RR02

The new open, freshly painted deck space after shed demo – all this space was under the shed in 2009 and half in 2013;

16-07-RR07a

Combination wooden bench/balance beam/toddler table/moveable space divider and also a fun little fold-up/down table (extra parts).  This is the same camera angle as the ‘before demo’ picture.

16-07-RR07b

View of new space from the gravel area;

16-07-RR06b

Wood, gravel, garden, mulch – texture everywhere 🙂

 

 

 

Reality

Last year I began making plans to overhaul my front yard – I wrote about it here. I ordered my plants months ago and made arrangements to pick them up on May 27th.  This weekend – all three days – I was planning to get the yard ready for planting.  The weekend is over and I’m not finished the prep work.

First, I had a list of little things that could be done on evenings and weekends before the May long weekend – very few of them got done ahead of time so that made my weekend ‘to do’ list even longer.  Three days were probably not going to be enough to get all the work done. Then there were a few other obstacles.

Friday evening there was a thunderstorm.  That was really not a bad thing because if there had not been a storm I would have probably wanted to plunge right into the yard work with only a few hours of daylight left.  A few hours of work is just enough for me to really get ‘into’ the job and I wouldn’t have wanted to stop.

The real setback was the full day of steady rain on Saturday so no yard work got done that day.  The day wasn’t completely wasted – I got a lot of paperwork done.  I finished work on the 2013 resource calendar and sent it off to MCCA for final edit so that big job is completed – early.  However, the yard renovation was way behind schedule.

On Sunday the weather was absolutely perfect for doing yard work.  Dealing with canker worms was the only issue.  We may have gotten a lot of work done but even though I skipped a meal or two I didn’t want ‘protein’ added to my coffee.  My husband suggested that we should patent my fancy cup covers (empty plastic containers turned upside down).

By Monday morning I had already realized that there was no chance that the yard work would be complete.  It was a good thing that I hadn’t ordered soil to be delivered for the garden beds because I wasn’t even close to having the gravel moved out of the way yet.

My husband and I dug up and relocated 18 small and medium sized sidewalk blocks to make room for the new flower beds.  Then we made a horrifying discovery – ten years ago, when we put all this gravel and sidewalk in, we put it over the original sidewalk.  We had forgotten that it was there so now we were staring at three 30” x 36” slabs of concrete that were four inches thick!  I was certain that my native prairie plants would not be happy if we just put soil over those slabs.  We would have to take them out.

While we worked on our yard there were many real estate agents and prospective buyers coming to view the house next door. I struggled with trying to be friendly without coming across as the nosy neighbour. Wielding a sledge hammer I may have come across as crazy.  I had an enjoyable conversation with one woman until our husbands interrupted us.  Maybe she was crazy too – I liked her.

We got one concrete slab removed before the rain returned and we quit working. The whole project may have been too big for two people to complete in three days.  It was definitely too much for the 1 ½ days of good weather that we had.  It is not complete, the reality is – it is a work in progress.